Modular design: In modular design, each functional module is independently set up to facilitate the combination and adjustment according to actual needs.
Prefabricated integration: Prefabricated and integrated at factories or production bases, including equipment installation, wiring, commissioning, etc., significantly shortened the on-site construction time.
Fast installation: The substation is transported as a whole, and after reaching the site of use, it only needs simple installation and connection to external power sources, negative loads, etc. to be put into use, saving construction time and human resources.